March 2023 Project Photos Water diversion operations. Removal of Ivy Street bridge. Ivy Street Bridge demolition. Snow’s Specialty Drilling performing drilling of Pier 1. Flatiron Constructors removing asphalt pavement along Riverside Drive. New concrete curb & gutter, driveway aprons, and sidewalk will be constructed here. Rumler Civil Construction tying reinforcing steel for the 30-inch diameter drilled shafts. Flatiron Constructors installing a 16-inch diameter waterline near Piccadilly Square. View of area where the new roundabout will be located. An existing cast-in-place wall was removed recently. A new mechanically-stabilized earth (MSE) wall will be constructed at this location. Snow’s Specialty Drilling setting a rebar cage into a 30-inch diameter drilled shaft at Pier 1. Shaft holes were cleaned and dewatered prior to concrete placement. Vivid Engineering performing in-place density testing on trench backfill with a nuclear density gauge. Flatiron Constructors compacting backfill in the trench for the waterline along Riverside Dr.